The process of commissioning a building is an essential tool for optimizing energy performance. Over the life span of a facility, many factors contribute to changes in the operation of the various systems and envelope components, which often requires an effort to bring the building back into the original operational standards for energy efficiency and occupant comfort. The Raba Kistner Facilities process ensures that all building systems perform interactively according to the contract documents, the design intent and the Owner’s operational needs.
Building Commissioning services include:
- Owner’s Representative
- Whole Building Commissioning
- Retro-Commissioning
- Operation Verification
- LEED Accreditation
